Computational Cluster Project
The following is a list of the steps we took to bring up our computational cluster:
- Linux Installation
- Network Information Services (NIS) setup
- Network File System (NFS) setup
- Message Passing Interface (MPI) installation
- Sun Grid Engine (SGE) installation
Click here for an overview of system operation.
Click here for our thrilling
conclusion.